Business

Business

Project

Inchangcheon aquatic ecosystem restoration plan establishment service

  • Client

    Guri City

  • Project Period

    2023.03-2023.03

Inchangcheon Water Ecosystem Restoration Plan

  • Project Specification

    Covered section of Inchangcheon Stream: L=490m B =18m
    ○ Other small streams: Anmal (1) Gaeulcheon, Umicheon, Baekgyocheon, Saetdaricheon
  • Project
    Image

  • Project
    Description

    Establish a restoration plan to provide a pleasant resting and leisure space for citizens by first creating a waterfront space with a vital ecological stream and a resting place in the former Inchangcheon Stream, which has been covered and used as a parking lot. Searching for multilateral measures for restoration, such as securing the health of the water ecosystem, selecting restoration priorities and planning restoration directions considering feasibility and economic feasibility