Business

Business

Project

Basic and Detailed Design for Deoksan Mountain Facility Development Project

  • Client

    Gwangmyeong City

  • Project Period

    2021.02-2021.12

  • Project Specification

    - Sidewalk suspension bridge (rocking bridge)
    (L=100.5m, B=1.5m)
  • Project
    Image

  • Project
    Description

    A swinging bridge (overpass) is installed in the artificial waterfall of Mt. Dokdo Neighborhood Park so that people can enjoy the beautiful natural scenery. It aims to provide eco-friendly tourism infrastructure by emphasizing the organic connection with surrounding tourism resources and forests.